Title :
Assessment of suitability of different reliability importance measures for prioritising replacement of transmission system components
Author :
Awadallah, Selma K.E. ; Milanovic, Jovica V. ; Zhongdong Wang ; Jarman, Paul N.
Author_Institution :
The University of Manchester, UK
fDate :
June 29 2015-July 2 2015
Abstract :
The paper presents a comparison of four widely used reliability importance measures in order to identify their appropriateness for the identification of the most critical system components for replacement planning; specifically when using Non-sequential Monte Carlo method. These importance measures are Improvement Potential, Structural Importance, Criticality Importance, and Fussell-Vesely Importance. The four reliability importance measures were calculated for each system component (power transformer in this particular study) and then components were ranked separately based on each measure. Then, the components were replaced, one by one starting from the most critical, to establish the relationship between the replacement according to each ranking and the overall system reliability. The study was performed on a realistic transmission network containing 154 transformers. The results of the paper proved that Improvement Potential is the most appropriate importance measure for replacement planning.
Keywords :
Planning; Reliability; Non-sequential Monte Carlo simulation; end-of-life failure; reliability importance measures; replacement;
Conference_Titel :
PowerTech, 2015 IEEE Eindhoven
Conference_Location :
Eindhoven, Netherlands
DOI :
10.1109/PTC.2015.7232295