• DocumentCode
    1982697
  • Title

    Synchronous phase changes due to the gap in the bunch train [particle beam]

  • Author

    Greenwald, Z. ; Tigner, M.

  • Author_Institution
    Lab. of Nucl. Studies, Cornell Univ., Ithaca, NY, USA
  • fYear
    1993
  • fDate
    17-20 May 1993
  • Firstpage
    3690
  • Abstract
    The B Factory bunch train in both beams is designed with a 250 nsec gap in order to minimize ion trapping. Possible differences in the synchronous phase between the bunches due to this gap in the bunch train are studied. Such an unequal phase shift between the bunches could lower the luminosity
  • Keywords
    beam handling techniques; electron accelerators; storage rings; 250 ns; B Factory; bunch train; ion trapping; luminosity; phase shift; synchronous phase; Energy loss; Laboratories; Niobium; Particle beams; Production facilities; Radio frequency; Resonance; Resonant frequency; Steady-state; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1993., Proceedings of the 1993
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-1203-1
  • Type

    conf

  • DOI
    10.1109/PAC.1993.309760
  • Filename
    309760