DocumentCode
1982697
Title
Synchronous phase changes due to the gap in the bunch train [particle beam]
Author
Greenwald, Z. ; Tigner, M.
Author_Institution
Lab. of Nucl. Studies, Cornell Univ., Ithaca, NY, USA
fYear
1993
fDate
17-20 May 1993
Firstpage
3690
Abstract
The B Factory bunch train in both beams is designed with a 250 nsec gap in order to minimize ion trapping. Possible differences in the synchronous phase between the bunches due to this gap in the bunch train are studied. Such an unequal phase shift between the bunches could lower the luminosity
Keywords
beam handling techniques; electron accelerators; storage rings; 250 ns; B Factory; bunch train; ion trapping; luminosity; phase shift; synchronous phase; Energy loss; Laboratories; Niobium; Particle beams; Production facilities; Radio frequency; Resonance; Resonant frequency; Steady-state; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location
Washington, DC
Print_ISBN
0-7803-1203-1
Type
conf
DOI
10.1109/PAC.1993.309760
Filename
309760
Link To Document