• DocumentCode
    1983881
  • Title

    Estimating costs to achieve particular levels of reliability

  • Author

    Taylor, Tim

  • Volume
    1
  • fYear
    2001
  • fDate
    15-19 July 2001
  • Firstpage
    526
  • Abstract
    It will become increasingly more important to be able to estimate the cost of achieving a given level of reliability for a distribution company. Specifically, if baseline values of reliability are to be established by utility regulators, distribution companies need to understand the amount of expenditure required to reach a particular level of reliability. There is no easy method to do this, but distribution engineers and planners play a key role in estimating the cost of obtaining a given level of reliability. From a distribution engineering perspective, the first step to determine the costs needed to achieve a given level of reliability is the review of system design audit and review of past performance. This generates insight into the underlying causes of poor reliability. This is a necessary first step in being able to gauge how reliability-improvement funds can be spent most effectively. The system design audit involves a physical inspection of representative areas of the distribution system. During the audit, it is also important for the auditor to have discussions with area engineers and operating personnel to gain their perspective on the root causes of reliability problems.
  • Keywords
    economics; investment; power distribution economics; power distribution planning; power distribution reliability; costs estimation; distribution company; distribution engineering; distribution network reliability; expenditure planning; physical inspection; reliability-improvement funds; system design audit; Costs; Design engineering; Equipment failure; Guidelines; Inspection; Investments; Personnel; Protection; Regulators; Reliability engineering;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society Summer Meeting, 2001
  • Conference_Location
    Vancouver, BC, Canada
  • Print_ISBN
    0-7803-7173-9
  • Type

    conf

  • DOI
    10.1109/PESS.2001.970082
  • Filename
    970082