DocumentCode :
1987816
Title :
The effect of time-delayed measurements on a PMU-based state estimator
Author :
Asprou, Markos ; Kyriakides, Elias
Author_Institution :
Department of Electrical and Computer Engineering, KIOS Research Center for Intelligent Systems and Networks, University of Cyprus, Nicosia, Cyprus
fYear :
2015
fDate :
June 29 2015-July 2 2015
Firstpage :
1
Lastpage :
6
Abstract :
The complete integration of the Synchronized Measurement Technology (SMT) in the power systems will bring about fundamental changes to the applications of the control center. One of the natural applications of the SMT is the state estimation. Although the state estimator is used for monitoring the steady state operating condition, it is envisioned that in the near future, a PMU-based state estimator will be able to monitor the dynamic behavior of the power system states. In such an application, the transfer delay of the PMU measurements should not be ignored. In this work, the effect of the PMU measurements transfer delay on the accuracy of a PMU-based state estimator is examined. Further, the optimal waiting time of the Phasor Data Concentrators (for sending information to the control center), and the time execution of a PMU-based state estimator for capturing accurately the state transients during fault conditions are also examined.
Keywords :
Area measurement; Generators; Measurement uncertainty; Monitoring; Phase measurement; Synchronization; Wide area networks; Phasor data concentrator; measurement transfer delay; phasor measurement unit; state estimation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
PowerTech, 2015 IEEE Eindhoven
Conference_Location :
Eindhoven, Netherlands
Type :
conf
DOI :
10.1109/PTC.2015.7232545
Filename :
7232545
Link To Document :
بازگشت