• DocumentCode
    1991365
  • Title

    The resolution of the no-idle flow-shop problem

  • Author

    El Houda Saadani, N. ; Moalla, M.

  • Author_Institution
    Faculte des Sci. de Tunis, Campus Univ., Tunis, Tunisia
  • fYear
    2003
  • fDate
    14-18 July 2003
  • Firstpage
    86
  • Abstract
    Summary form only given. In a flow-shop organisation, all jobs follow the same route (machine sequence) and each job has exactly one operation on each machine. A permutation flow-shop is a flow-shop where all machines process the jobs in the same sequence. An important class of these scheduling problems is constrained by the no-idle production environment, where the machines work continuously without any interruption from the start of the first job processing to the last job completion. We present the F/no-idle/c problem and the different proposed heuristics and exact method. Experiments about a branch and bound algorithm are presented.
  • Keywords
    constraint theory; continuous production; flow shop scheduling; heuristic programming; job shop scheduling; tree searching; F/no-idle/c problem; branch and bound algorithm; machine sequence; makespan; no-idle flow-shop problem; no-idle production environment; permutation flow-shop; proposed heuristics; scheduling problem; Continuous production; Job production systems; Scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Systems and Applications, 2003. Book of Abstracts. ACS/IEEE International Conference on
  • Conference_Location
    Tunis, Tunisia
  • Print_ISBN
    0-7803-7983-7
  • Type

    conf

  • DOI
    10.1109/AICCSA.2003.1227518
  • Filename
    1227518