• DocumentCode
    1996363
  • Title

    Construction technology of underwater control blasting in hole-pile

  • Author

    Yang, Xuexiang ; Xiao, Lin

  • Author_Institution
    Sch. of Urban Constr., Yangtze Univ., Jingzhou, China
  • fYear
    2011
  • fDate
    16-18 Sept. 2011
  • Firstpage
    2081
  • Lastpage
    2083
  • Abstract
    If there were hard boulders or rock layers distributed in the formation of pile foundation, it was difficulties to the drilling hole-pile. Blasting before drilling was used in hard rock layer; underwater control millisecond initiation was used in hole-pile; cumulative blasting was used in hard boulders; blasting was used in outshoot stones. Construction efficiency was greatly improved.
  • Keywords
    foundations; rocks; construction technology; cumulative blasting; hard boulders; hole-pile; pile foundation; rock layers; underwater control blasting; Bridges; Drugs; Electron tubes; Explosives; Road transportation; Rocks; blasting before drilling; construction of hole-pile; underwater blasting; underwater cumulative blasting; underwater millisecond initiation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical and Control Engineering (ICECE), 2011 International Conference on
  • Conference_Location
    Yichang
  • Print_ISBN
    978-1-4244-8162-0
  • Type

    conf

  • DOI
    10.1109/ICECENG.2011.6058129
  • Filename
    6058129