DocumentCode :
1996886
Title :
Re-learning design and build implementation process in Malaysia: Findings from a workshop
Author :
Isa, H.M. ; Hassan, P.F. ; Ishak, M.F. ; Zakaria, Nordin
Author_Institution :
Res. & Postgrad. Dept., Univ. Teknol. MARA, Shah Alam, Malaysia
fYear :
2012
fDate :
3-4 Dec. 2012
Firstpage :
314
Lastpage :
318
Abstract :
Over the last decade, the Design and Build (DB) procurement system had been introduced in Malaysia as an alternative to replace the traditional procurement system. However, contrary to the belief that the DB procurement will result in better project outcomes, many of the projects operated on the DB fell short of meeting the expectations. Some ended with worse than when operated with the traditional procurement system. The adequacy of the DB implementation process in Malaysia was researched to trace the root cause that contributed to the DB project failures. The findings from the initial research which suggest the factors that contributed to the failures were culminated and discussed in a specially organized workshop. During the workshop, 28 experts representing clients, consultants and contractors with experience with DB projects were gathered to suggest what can be re-learnt from the current DB implementation process. `Gaps´ which suggest weakness within existing implementation process were identified and the way forward for improving the practice of DB project implementation were proposed.
Keywords :
construction industry; design engineering; failure analysis; procurement; project management; DB procurement; DB project failures; DB project implementation; Malaysia; design-and-build procurement system; workshops; Design and Build; gaps; implementation process; problematic; re-learn;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Humanities, Science and Engineering (CHUSER), 2012 IEEE Colloquium on
Conference_Location :
Kota Kinabalu
Print_ISBN :
978-1-4673-4615-3
Type :
conf
DOI :
10.1109/CHUSER.2012.6504331
Filename :
6504331
Link To Document :
بازگشت