• DocumentCode
    2001970
  • Title

    Fuzzy project scheduling with multiple criteria

  • Author

    Hapke, Maciej ; Jaszkiewicz, Andrzej ; Slowinski, Roman

  • Author_Institution
    Inst. of Comput. Sci., Poznan Tech. Univ., Poland
  • Volume
    3
  • fYear
    1997
  • fDate
    1-5 Jul 1997
  • Firstpage
    1277
  • Abstract
    The multi-mode project scheduling problem under multi-category resource constraints (RCPS) with fuzzy time parameters of activities is considered. A fuzzy scheduling procedure using weak and strong comparison rules for fuzzy, numbers is presented. As the problem is of multi-objective nature, a metaheuristic procedure, called Pareto simulated annealing generating an approximation of the Pareto set is applied. A discrete version of the “light beam search” procedure allows for interactive analysis of the set of generated solutions and supports the decision maker in selecting the best compromise schedule
  • Keywords
    decision theory; fuzzy set theory; project management; scheduling; simulated annealing; Pareto simulated annealing; best compromise schedule; decision maker; fuzzy project scheduling; light beam search; metaheuristic procedure; multi-category resource constraints; multi-mode project scheduling problem; multiple criteria; strong comparison rules; weak comparison rules; Decision support systems; Delta modulation; Fuzzy sets; Processor scheduling; Simulated annealing; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Fuzzy Systems, 1997., Proceedings of the Sixth IEEE International Conference on
  • Conference_Location
    Barcelona
  • Print_ISBN
    0-7803-3796-4
  • Type

    conf

  • DOI
    10.1109/FUZZY.1997.619471
  • Filename
    619471