Study on installing small reactance in neutral point of 500kV transformer on Guangdong power grid
Author
Cao, Huazhen ; Cai, Guanglin ; Shi, Hui ; Zhang, Yongjun
Author_Institution
Guangdong Power Grid Corp., Guangzhou, China
fYear
2011
fDate
16-18 Sept. 2011
Firstpage
2594
Lastpage
2597
Abstract
With the 500kV substations put into operation one after the other, the capacity and scale of 500kV autotransformer are more and more large. The single-phase short-circuit current at 220 kV buses of 500kV substations is higher than three-phase, the safe operation can´t be satisfied. It can be controlled by adding small reactance at 500kV autotransformers from the operation experience of all over the world. This paper analyzes the reason and necessity for adding small reactance at 500kV autotransformers from the level of short current on Guangdong, and studies the types of substations which are fit to installing them. It also studies the effect of the small reactance capacity on limiting short-circuit current of single phase, and proposes the installation program for Guangdong power grid.
Keywords
power grids; power transformers; short-circuit currents; substations; Guangdong power grid; autotransformer; neutral point; single-phase short-circuit current; small reactance installation; substations; voltage 220 kV; voltage 500 kV; Limiting; Power grids; Power supplies; Power transformer insulation; Resistance; Substations; Voltage measurement; neutral point; power grid; short-circuit current; small reactance;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical and Control Engineering (ICECE), 2011 International Conference on
Conference_Location
Yichang
Print_ISBN
978-1-4244-8162-0
Type
conf
DOI
10.1109/ICECENG.2011.6058464
Filename
6058464
Link To Document