DocumentCode :
2008846
Title :
The test, usage and maintenance of power switching subsystems
Author :
Paton, Kevin
Author_Institution :
Teradyne, Inc., North Reading, MA, USA
fYear :
2011
fDate :
12-15 Sept. 2011
Firstpage :
435
Lastpage :
439
Abstract :
Unlike signal switching, power switches have significant minimum operational requirements for both voltage and current. These minimum requirements affect usage in test programs and self test approaches. This paper will discuss the considerations necessary when testing power switches or when using power switching in test programs. In addition, techniques will be described which can reduce or remove build up of deposits, improving switch operation.
Keywords :
maintenance engineering; switchgear; switchgear testing; operational requirement; power switch testing; power switching subsystems maintenance; selftest approach; signal switching; test program; Cleaning; Contacts; Gold; Power supplies; Relays; Switches; Voltage measurement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
AUTOTESTCON, 2011 IEEE
Conference_Location :
Baltimore, MD
ISSN :
1088-7725
Print_ISBN :
978-1-4244-9362-3
Type :
conf
DOI :
10.1109/AUTEST.2011.6058793
Filename :
6058793
Link To Document :
بازگشت