• DocumentCode
    2009650
  • Title

    Distribution reliability modeling at Commonwealth Edison

  • Author

    Brown, Richard E.

  • Author_Institution
    ABB Consulting, Raleigh, NC, USA
  • Volume
    2
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    917
  • Abstract
    In the late summer of 1999, Commonwealth Edison experienced several major events impacting critical loads in downtown Chicago. These events led to multiple reliability improvement initiatives including the development of a predictive distribution system reliability model containing more than 3300 feeders. This paper discusses the reliability model, the modeling effort and a summary of results. In addition, the paper discusses the efforts to integrate reliability assessment into Commonwealth Edison´s planning process
  • Keywords
    power distribution reliability; Chicago; Commonwealth Edison; capacity constrained load transfers; computer generated reliability improvement; distribution reliability modeling; feeders; peak loading assessment; predictive distribution system reliability model; reliability improvement initiatives; root cause analysis; Load flow; Load flow analysis; Power system modeling; Power system reliability; Predictive models; Process planning; Samarium; Substations; Switches; Topology;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Conference and Exposition, 2001 IEEE/PES
  • Conference_Location
    Atlanta, GA
  • Print_ISBN
    0-7803-7285-9
  • Type

    conf

  • DOI
    10.1109/TDC.2001.971362
  • Filename
    971362