DocumentCode :
2016977
Title :
The study on resource constraint project scheduling problem under stochastic circumstances
Author :
Li, Xiuming ; Wang, Wenjun ; Zeng, Xiong
Author_Institution :
Sch. of Civil Eng. & Archit., Central South Univ., Changsha, China
Volume :
3
fYear :
2010
fDate :
17-18 July 2010
Firstpage :
648
Lastpage :
651
Abstract :
Exploring a baseline schedule for list of activities under resource constraints called RCPSP attracts attention of many researches in recent decades. Most of procedures including exact and heuristic ones are developed in a static and deterministic environment. While cases in which complete information regarding activities´ duration, resource availabilities and resource usages are known in advance are rarely happen in practice. In this paper we study an extension of basic stochastic RCPSP in which uncertainty come to play on resource availabilities. Numerical results revealed that proposed procedure yields significant performance gains over the ignorance of proactive strategies.
Keywords :
constraint theory; resource allocation; scheduling; set theory; stochastic processes; resource availabilities; resource constraint project scheduling problem; stochastic circumstance; Availability; Robustness; Schedules; Transmission line measurements; Variable speed drives; RCPSP; Stochastic; Uncertain Resource Availabilities;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Environmental Science and Information Application Technology (ESIAT), 2010 International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-7387-8
Type :
conf
DOI :
10.1109/ESIAT.2010.5568738
Filename :
5568738
Link To Document :
بازگشت