DocumentCode
2016977
Title
The study on resource constraint project scheduling problem under stochastic circumstances
Author
Li, Xiuming ; Wang, Wenjun ; Zeng, Xiong
Author_Institution
Sch. of Civil Eng. & Archit., Central South Univ., Changsha, China
Volume
3
fYear
2010
fDate
17-18 July 2010
Firstpage
648
Lastpage
651
Abstract
Exploring a baseline schedule for list of activities under resource constraints called RCPSP attracts attention of many researches in recent decades. Most of procedures including exact and heuristic ones are developed in a static and deterministic environment. While cases in which complete information regarding activities´ duration, resource availabilities and resource usages are known in advance are rarely happen in practice. In this paper we study an extension of basic stochastic RCPSP in which uncertainty come to play on resource availabilities. Numerical results revealed that proposed procedure yields significant performance gains over the ignorance of proactive strategies.
Keywords
constraint theory; resource allocation; scheduling; set theory; stochastic processes; resource availabilities; resource constraint project scheduling problem; stochastic circumstance; Availability; Robustness; Schedules; Transmission line measurements; Variable speed drives; RCPSP; Stochastic; Uncertain Resource Availabilities;
fLanguage
English
Publisher
ieee
Conference_Titel
Environmental Science and Information Application Technology (ESIAT), 2010 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-7387-8
Type
conf
DOI
10.1109/ESIAT.2010.5568738
Filename
5568738
Link To Document