Duration Estimation, a New Approach in Critical Chain Scheduling
Author
Rezaie, K. ; Manouchehrabadi, B. ; Shirkouhi, S. Nazari
Author_Institution
Ind. Eng. Dept., Univ. of Tehran, Tehran
fYear
2009
fDate
25-29 May 2009
Firstpage
481
Lastpage
484
Abstract
Critical chain project management (CCPM) has been introduced in 1997 by Goldratt which was known for its theory, theory of constraint. Since then CCPM attracted a great attention both in academic world and execution communities. One of the most controversial points of the CCPM which is a subject of critics is the way it suggests for activity duration estimation. This paper proposes a new method for duration estimation of activities by measuring the amount of uncertainty embedded in each activity duration and then taking out of safety times associated with this uncertainty. The validity of the proposed method is tested by conducting a computer simulation on some test problems. Simulation analysis shows that the proposed method yields schedules which are more reliable than the schedules produced by original CCPM method of duration estimation.
Keywords
critical path analysis; estimation theory; project management; scheduling; CCPM method; critical chain project management; critical chain scheduling approach; duration estimation; Constraint theory; Industrial engineering; Job shop scheduling; Modeling; Processor scheduling; Project management; Safety; Scheduling algorithm; Software algorithms; Uncertainty; Critical chain; Duration estimation; Theory of constraint; project scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Modelling & Simulation, 2009. AMS '09. Third Asia International Conference on
Conference_Location
Bali
Print_ISBN
978-1-4244-4154-9
Electronic_ISBN
978-0-7695-3648-4
Type
conf
DOI
10.1109/AMS.2009.67
Filename
5072034
Link To Document