DocumentCode
2026357
Title
Results of modern pilot schemes tests for general electric line protection devices
Author
Bartosiewicz, E. ; Januszewski, M. ; Rasolomampionona, Desire
Author_Institution
Warsaw Univ. of Technol., Warsaw, Poland
fYear
2013
fDate
16-20 June 2013
Firstpage
1
Lastpage
6
Abstract
The paper presents some results of modern pilot schemes tests and the testing methods description. Distance protection coordination functions have been tested for GE Multilin UR-series devices. Every type of available pilot scheme has been checked in synthetic test and during the real coordination between D60 and D90Plus devices. For POTT scheme, coordination between two L90 protections has been realized through the different communication link types, for comparison reasons.
Keywords
power transmission protection; relay protection; D60 devices; D90Plus devices; L90 protections; POTT scheme; distance protection coordination functions; general electric line protection devices; permissive over-reaching transfer; pilot schemes test; synthetic test; Delays; Optical fiber networks; Performance evaluation; Power transmission lines; Protocols; Relays; Synchronous digital hierarchy; power system protection; substation protection; testing of power protection; transmission line;
fLanguage
English
Publisher
ieee
Conference_Titel
PowerTech (POWERTECH), 2013 IEEE Grenoble
Conference_Location
Grenoble
Type
conf
DOI
10.1109/PTC.2013.6652478
Filename
6652478
Link To Document