• DocumentCode
    2026357
  • Title

    Results of modern pilot schemes tests for general electric line protection devices

  • Author

    Bartosiewicz, E. ; Januszewski, M. ; Rasolomampionona, Desire

  • Author_Institution
    Warsaw Univ. of Technol., Warsaw, Poland
  • fYear
    2013
  • fDate
    16-20 June 2013
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The paper presents some results of modern pilot schemes tests and the testing methods description. Distance protection coordination functions have been tested for GE Multilin UR-series devices. Every type of available pilot scheme has been checked in synthetic test and during the real coordination between D60 and D90Plus devices. For POTT scheme, coordination between two L90 protections has been realized through the different communication link types, for comparison reasons.
  • Keywords
    power transmission protection; relay protection; D60 devices; D90Plus devices; L90 protections; POTT scheme; distance protection coordination functions; general electric line protection devices; permissive over-reaching transfer; pilot schemes test; synthetic test; Delays; Optical fiber networks; Performance evaluation; Power transmission lines; Protocols; Relays; Synchronous digital hierarchy; power system protection; substation protection; testing of power protection; transmission line;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    PowerTech (POWERTECH), 2013 IEEE Grenoble
  • Conference_Location
    Grenoble
  • Type

    conf

  • DOI
    10.1109/PTC.2013.6652478
  • Filename
    6652478