DocumentCode :
2026885
Title :
Commissioning and first operation of the W VII-AS neutral beam system
Author :
Penningsfeld, F.P. ; Feist, J.H. ; Freudenberger, K. ; Ott, W. ; Speth, E.
Author_Institution :
Max Planck Inst. for Plasmaphys., EURATOM Assoc., Garching, West Germany
fYear :
1989
fDate :
2-6 Oct 1989
Firstpage :
288
Abstract :
The neutral injection (NI) system of the Wendelstein VII-AS modular stellarator has been commissioned and was successfully operated during the first experimental phase of W VII-AS. The NI system consists of two boxes of the LPNI/ASDEX type positioned in the co and counter directions to reduce beam-driven currents and momentum input. More than 870 injection shots and over 12000 internal shots for source conditioning and beam diagnostics were performed, showing the advantages of the programmable controller used and the routinely performed beam diagnostics with a MicroVax II computer. The main components specific to NI/W VIII-AS and initial operational experience are described. The water-calorimetric measurements of the conically tapered duct are discussed. The measurements were taken after the duct was subjected to direct beam losses and they show the conditioning of the duct wall
Keywords :
ion beams; plasma heating; stellarators; MicroVax II computer; W VII-AS; Wendelstein VII-AS modular stellarator; beam diagnostics; beam losses; conically tapered duct; injection shots; internal shots; neutral beam system; neutral injection; programmable controller; source conditioning; water-calorimetric measurements; Coils; Counting circuits; Ducts; Heating; Loss measurement; Magnetic field measurement; Particle beam measurements; Plasmas; Programmable control; Variable speed drives;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Fusion Engineering, 1989. Proceedings., IEEE Thirteenth Symposium on
Conference_Location :
Knoxville, TN
Type :
conf
DOI :
10.1109/FUSION.1989.102225
Filename :
102225
Link To Document :
بازگشت