DocumentCode
2041536
Title
Research on automatic planning of main clamping points in rapid fixture design system
Author
Yu, Jing ; Wen, Ting ; Hu, Qingxi
Author_Institution
Rapid Manuf. Eng. Center, Shanghai Univ., Shanghai, China
Volume
6
fYear
2010
fDate
10-12 Aug. 2010
Firstpage
2657
Lastpage
2661
Abstract
The automation of fixture planning plays a vital role in improving the efficiency of fixture design and manufacture. An automatic approach for rapid fixture planning was presented to determinate the three main clamping points based on geometry analysis. The processing procedure of this approach consist of four steps, such as: extraction of workpiece model projecting outline boundary, simplification of the boundary, determination of feasible clamping plans and acquirement of the optimum plan. According to the above approach, a rapid fixture automatic design system which based on UG/NX platform has been developed, and the effectiveness of the proposed approach is verified by a given example.
Keywords
clamps; computer aided manufacturing; factory automation; fixtures; geometry; UG/NX platform; automatic planning; feasible clamping plans; fixture design efficiency; fixture planning automation; geometry analysis; main clamping points; optimum plan acquirement; rapid fixture automatic design system; rapid fixture design system; workpiece model projecting outline boundary; Clamps; Fixtures; Force; Manufacturing; Planning; Shape; Solid modeling; CAFD; RP; automatic fixture planning; boundary extraction; computer-aided fixture design; discretization; rapid prototyping;
fLanguage
English
Publisher
ieee
Conference_Titel
Fuzzy Systems and Knowledge Discovery (FSKD), 2010 Seventh International Conference on
Conference_Location
Yantai, Shandong
Print_ISBN
978-1-4244-5931-5
Type
conf
DOI
10.1109/FSKD.2010.5569803
Filename
5569803
Link To Document