DocumentCode :
2042122
Title :
Rearrange and Reform of Product Line Based on Computer Simulation Technology
Author :
Yang, Xue-feng ; Ze, Xiang-bo ; Wang, Hui ; Wang, Hong-yan
Author_Institution :
Dept. of Mech. Eng., Univ. of Jinan, Jinan
fYear :
2009
fDate :
23-24 May 2009
Firstpage :
1
Lastpage :
4
Abstract :
The novelty method is used for analyses and diagnoses of product line. The virtual design and modeling method are introduced through the real case. In simulation environment, it showed that there were some bottle-neck processes because of defective manufacturing technology. After produce line rebuilt in simulation, the average manufacturing technology time was about 41.2s. The utility ratio of machines and productivity of workers trended to average, and the bottle-neck processes are solved quickly through visual simulation and adjusting the manufacturing technology. So this method can design, analyze and rebuild the produce line rapidly. It is the predictable analyses way for manufacturing programming of product in order to response the market and satisfy the individuation requirement of client.
Keywords :
production management; productivity; virtual manufacturing; bottle-neck processes; computer simulation technology; individuation requirement; manufacturing programming; manufacturing technology; product line; productivity; virtual design; visual simulation; Analytical models; Computational modeling; Computer simulation; Design methodology; Manufacturing processes; Manufacturing systems; Process design; Production; Solid modeling; Virtual manufacturing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Systems and Applications, 2009. ISA 2009. International Workshop on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-3893-8
Electronic_ISBN :
978-1-4244-3894-5
Type :
conf
DOI :
10.1109/IWISA.2009.5073029
Filename :
5073029
Link To Document :
بازگشت