Title :
The heuristic approach in IDSS for project planning and scheduling
Author :
Deng Guishi ; He Yonghong
Author_Institution :
Inst. of Syst. Eng., Dalian Univ. of Technol., China
Abstract :
Classical project planning and scheduling techniques have been successful in project management. At the present, intelligent decision support systems (IDSS) have been proposed and applied in real world. We propose a heuristic approach in IDSS for project planning and scheduling and developed a synthesis system of project management and control decision support system (PMCDSS), which is an intelligent interactive computer-based system. In this paper we discuss the heuristic approach based on PMCDSS. The main ideas are: (1) Building an adaptive model (e.g. object-oriented modeling) to represent the multiobjective problem in project management. (2) The core of such model is resources allocation. (3) Domain knowledge representation and inference.<>
Keywords :
decision support systems; heuristic programming; interactive systems; knowledge based systems; project management; DSS; IDSS; PMCDSS; adaptive model; domain knowledge representation; heuristic approach; inference; intelligent decision support systems; intelligent interactive computer-based system; multiobjective problem; object-oriented modeling; project management; project planning; project scheduling; resource allocation; Coils; Costs; Mathematical model; Object oriented modeling; Optimal scheduling; Project management; Resource management; Sufficient conditions; Testing; Time measurement;
Conference_Titel :
TENCON '93. Proceedings. Computer, Communication, Control and Power Engineering.1993 IEEE Region 10 Conference on
Conference_Location :
Beijing, China
Print_ISBN :
0-7803-1233-3
DOI :
10.1109/TENCON.1993.320435