DocumentCode
2042852
Title
A combined process/resource model for shop floor simulation
Author
Jang, Pyoung Yol ; Jones, Albert ; Park, Sungsik ; Cho, Hyunbo
Author_Institution
Div. of Mech. & Ind. Eng., Pohang Univ. of Sci. & Technol., South Korea
Volume
2
fYear
2001
fDate
2001
Firstpage
1310
Abstract
The paper describes process and resource modeling capabilities of PRISM (process and resource model-based intelligent simulator). The former allows users to model nonlinear process plans that contain all possible routings through the processes in the shop, decision-making rules associated with those routings, and precedence relationships among the processes in those routings. The latter allows users to define all of the properties of shop floor resources and decision rules associated with those resources
Keywords
computer aided production planning; digital simulation; knowledge based systems; resource allocation; PRISM; combined process/resource model; decision rules; decision-making rules; nonlinear process plans; precedence relationships; process and resource model based intelligent simulator; process modeling; resource modeling capabilities; shop floor resources; shop floor simulation; Control systems; Drilling; Industrial engineering; Job shop scheduling; Magnetic heads; Manufacturing processes; Milling; NIST; Routing; Turning;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man, and Cybernetics, 2001 IEEE International Conference on
Conference_Location
Tucson, AZ
ISSN
1062-922X
Print_ISBN
0-7803-7087-2
Type
conf
DOI
10.1109/ICSMC.2001.973102
Filename
973102
Link To Document