• DocumentCode
    2042852
  • Title

    A combined process/resource model for shop floor simulation

  • Author

    Jang, Pyoung Yol ; Jones, Albert ; Park, Sungsik ; Cho, Hyunbo

  • Author_Institution
    Div. of Mech. & Ind. Eng., Pohang Univ. of Sci. & Technol., South Korea
  • Volume
    2
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    1310
  • Abstract
    The paper describes process and resource modeling capabilities of PRISM (process and resource model-based intelligent simulator). The former allows users to model nonlinear process plans that contain all possible routings through the processes in the shop, decision-making rules associated with those routings, and precedence relationships among the processes in those routings. The latter allows users to define all of the properties of shop floor resources and decision rules associated with those resources
  • Keywords
    computer aided production planning; digital simulation; knowledge based systems; resource allocation; PRISM; combined process/resource model; decision rules; decision-making rules; nonlinear process plans; precedence relationships; process and resource model based intelligent simulator; process modeling; resource modeling capabilities; shop floor resources; shop floor simulation; Control systems; Drilling; Industrial engineering; Job shop scheduling; Magnetic heads; Manufacturing processes; Milling; NIST; Routing; Turning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man, and Cybernetics, 2001 IEEE International Conference on
  • Conference_Location
    Tucson, AZ
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-7087-2
  • Type

    conf

  • DOI
    10.1109/ICSMC.2001.973102
  • Filename
    973102