Title :
Risk Assessment of International Project Contracting Based on Unascertained Set
Author :
Zhou, Shu-jing ; Liu, Li-bo ; Wu, Chao ; Li, Yan-cang
Author_Institution :
Coll. of Civil Eng., Hebei Univ. of Eng., Handan
fYear :
2009
fDate :
23-24 May 2009
Firstpage :
1
Lastpage :
4
Abstract :
To management the risk of International Project Contracting where the chance and risk are accreted and the risk is bigger than the domestic engineering, the paper sets up the comprehensive evaluation system and a model of risk assessment by using the unascertained set for evaluating the risk of the international project contracting. Finally, the practicality and feasibility of the model are illustrated by the engineering practice.
Keywords :
risk management; comprehensive evaluation; international project contracting; risk assessment; unascertained set; Chaos; Civil engineering; Contracts; Control systems; Educational institutions; Engineering management; Environmental economics; International relations; Project management; Risk management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Systems and Applications, 2009. ISA 2009. International Workshop on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-3893-8
Electronic_ISBN :
978-1-4244-3894-5
Type :
conf
DOI :
10.1109/IWISA.2009.5073098
Filename :
5073098
Link To Document :
بازگشت