DocumentCode :
2045456
Title :
Building a new overlay grid for Europe
Author :
Ergun, H. ; Beerten, J. ; Van Hertem, D.
Author_Institution :
Dept. of Electr. Eng., KU Leuven, Heverlee, Belgium
fYear :
2012
fDate :
22-26 July 2012
Firstpage :
1
Lastpage :
8
Abstract :
The strong growth and the expected further increase in renewable energy generation in Europe requires a fundamental upgrade of the transmission system. A potential option is to realize these upgrades at a higher voltage by constructing a new overlay grid or supergrid. Such a supergrid is likely to be built using VSC HVDC technology, especially when considering that a significant part will be offshore. The paper will first discuss how such a grid should be conceived. Aspects that will be covered are the potential topology of such a grid and the balance between mesh size and the connection to the AC system. It will be discussed how such a new overlay grid with multiple controllers interacts with the existing system. The second aspect that will be covered is the stepwise development of such a system. A new overlay grid will not be conceived in a single phase, but link by link. The differences between “green field” and “brown field” approach are highlighted and shown using an example.
Keywords :
HVDC power convertors; HVDC power transmission; power grids; AC system; Europe; VSC-HVDC technology; brown field approach; green field approach; overlay grid; renewable energy generation; supergrid; transmission system; voltage source converter; Electricity; Europe; HVDC transmission; Investments; Planning; Renewable energy resources; Topology; DC Grid; Integrated approach; Transmission system investments; VSC HVDC; supergrid;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Society General Meeting, 2012 IEEE
Conference_Location :
San Diego, CA
ISSN :
1944-9925
Print_ISBN :
978-1-4673-2727-5
Electronic_ISBN :
1944-9925
Type :
conf
DOI :
10.1109/PESGM.2012.6344805
Filename :
6344805
Link To Document :
بازگشت