DocumentCode :
2048456
Title :
The study on reclosure strategy of 750 kV transmission lines
Author :
Yongli, Li ; Bin, Li ; Kun, Sheng ; Yongchang, Zhai ; Zhiyu, Ma
Author_Institution :
Tianjin Univ., China
Volume :
2
fYear :
2004
fDate :
5-8 April 2004
Firstpage :
599
Abstract :
In order to maintain system security at an acceptable level and retain as much transmission line capacity as possible, autoreclosure technique offers an attractive solution to the problem. For a 750 kV transmission line, the problem of overvoltage is especially concerned. Therefore the reclosure strategy of 750 kV transmission lines should consider the effect of overvoltage. Based on the theoretical analysis, the paper researches the operating procedures of tripping and closing, the time interval of reclosure. What´s more, a novel single-phase reclosure scheme has been proposed as well, which can effectively restraint the influences of overvoltage. Simulation tests show that the proposed technique is of benefit to secure operation and power supply of 750 kV transmission lines.
Keywords :
overvoltage protection; power transmission faults; power transmission protection; relay protection; 750 kV; closing procedures; overvoltage protection; power transmission faults; power transmission protection; protective relays; reclosure strategy; reclosure time interval; single-phase reclosure scheme; tripping procedures;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Developments in Power System Protection, 2004. Eighth IEE International Conference on
ISSN :
0537-9989
Print_ISBN :
0-86341-385-4
Type :
conf
DOI :
10.1049/cp:20040195
Filename :
1364949