• DocumentCode
    2049772
  • Title

    Multiobject optimal scheduling for semiconductor manufacturing line based on satisfactory control

  • Author

    Wang, Zhongjie ; Wu, Qidi

  • Author_Institution
    CIMS Res. Center, Tongji Univ., Shanghai, China
  • Volume
    2
  • fYear
    2002
  • fDate
    2002
  • Firstpage
    1603
  • Abstract
    Due to more and more furious competition of microelectronic industry, the scheduling policies based on single-object can no longer meet the demand for the quality of semiconductor manufacturing line. This paper analyzes the performance targets of semiconductor manufacturing line, then extends the concept of satisfactory control to scheduling. Finally, the multiobject optimal scheduling based on satisfactory control is proposed. This method provides a way of performing an overall optimization of the manufacturing line.
  • Keywords
    electronics industry; optimisation; production control; semiconductor device manufacture; cycle-time; manufacturing line; microelectronic industry; multiobject optimal scheduling; optimization; production control; satisfactory control; scheduling; Computer integrated manufacturing; Integrated circuit manufacture; Job shop scheduling; Manufacturing industries; Manufacturing processes; Optimal control; Optimal scheduling; Pulp manufacturing; Queueing analysis; Semiconductor device manufacture;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    American Control Conference, 2002. Proceedings of the 2002
  • ISSN
    0743-1619
  • Print_ISBN
    0-7803-7298-0
  • Type

    conf

  • DOI
    10.1109/ACC.2002.1023251
  • Filename
    1023251