• DocumentCode
    2055903
  • Title

    Development of an integrated system for setup planning and fixture design in CAPP

  • Author

    Yuru, Zhang ; Gaoliang, Peng

  • Author_Institution
    Sch. of Electr. Eng. & Autom., Harbin Inst. of Technol.
  • fYear
    2005
  • fDate
    24-28 July 2005
  • Firstpage
    1401
  • Lastpage
    1406
  • Abstract
    The separation of CAPP and CAFD often causes conflict and delays for the product development. This paper overcomes these obstacles by describing a developed system that is capable of carrying out setup planning and fixture design concurrently. An intelligent approach for setup planning is introduced. In this approach, the setups are automatically planned based on key factors of machining practice, tolerance requirement, manufacturing cost and fixturing constraints from the feedback of fixture design. Further more, a hybrid RBR and fuzzy evaluation method based automatic fixture design approach is also described. In proposed system, the feedback of fixture design is to ensure that the setup plan for machined part is generated on the basis of feasible fixture plan. An example is presented to illustrate the proposed system
  • Keywords
    computer aided production planning; process planning; product development; computer-aided fixture design; computer-aided process planning; fixture design; fixturing constraints; fuzzy evaluation method; integrated system; machining practice; manufacturing cost; product development; setup planning; tolerance requirement; Computer aided manufacturing; Costs; Delay; Design automation; Fixtures; Machining; Manufacturing automation; Mechatronics; Process planning; Product development;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Intelligent Mechatronics. Proceedings, 2005 IEEE/ASME International Conference on
  • Conference_Location
    Monterey, CA
  • Print_ISBN
    0-7803-9047-4
  • Type

    conf

  • DOI
    10.1109/AIM.2005.1511207
  • Filename
    1511207