DocumentCode
2055903
Title
Development of an integrated system for setup planning and fixture design in CAPP
Author
Yuru, Zhang ; Gaoliang, Peng
Author_Institution
Sch. of Electr. Eng. & Autom., Harbin Inst. of Technol.
fYear
2005
fDate
24-28 July 2005
Firstpage
1401
Lastpage
1406
Abstract
The separation of CAPP and CAFD often causes conflict and delays for the product development. This paper overcomes these obstacles by describing a developed system that is capable of carrying out setup planning and fixture design concurrently. An intelligent approach for setup planning is introduced. In this approach, the setups are automatically planned based on key factors of machining practice, tolerance requirement, manufacturing cost and fixturing constraints from the feedback of fixture design. Further more, a hybrid RBR and fuzzy evaluation method based automatic fixture design approach is also described. In proposed system, the feedback of fixture design is to ensure that the setup plan for machined part is generated on the basis of feasible fixture plan. An example is presented to illustrate the proposed system
Keywords
computer aided production planning; process planning; product development; computer-aided fixture design; computer-aided process planning; fixture design; fixturing constraints; fuzzy evaluation method; integrated system; machining practice; manufacturing cost; product development; setup planning; tolerance requirement; Computer aided manufacturing; Costs; Delay; Design automation; Fixtures; Machining; Manufacturing automation; Mechatronics; Process planning; Product development;
fLanguage
English
Publisher
ieee
Conference_Titel
Advanced Intelligent Mechatronics. Proceedings, 2005 IEEE/ASME International Conference on
Conference_Location
Monterey, CA
Print_ISBN
0-7803-9047-4
Type
conf
DOI
10.1109/AIM.2005.1511207
Filename
1511207
Link To Document