DocumentCode :
2056375
Title :
Unit Commitment and Dispatch Strategies for a Wind Park
Author :
Moyano, C.F. ; Lopes, J. A Peças
Author_Institution :
Instituto de Engenharia de Sistemas e Computadores do Porto, 4200-465 Porto, Portugal. cmoyano@inescporto.pt
fYear :
2007
fDate :
12-14 April 2007
Firstpage :
12
Lastpage :
17
Abstract :
This paper presents an optimization strategy to be adopted at wind park control level. This approach transposes the classical formulations of a unit commitment and a generator dispatch problem to the turbines of a wind park, assuming that variable speed wind turbines are installed, and considering that wind speed forecasts are available. Wind speed forecasts, demands from grid operators or generation levels defined to comply with market strategies are the inputs of the problem. A small example is used to illustrate the proposed approach.
Keywords :
Centralized control; Control systems; Induction generators; Mesh generation; Power generation; Wind energy generation; Wind forecasting; Wind power generation; Wind speed; Wind turbines;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering, Energy and Electrical Drives, 2007. POWERENG 2007. International Conference on
Conference_Location :
Setubal, Portugal
Print_ISBN :
978-1-4244-0895-5
Electronic_ISBN :
978-1-4244-0895-5
Type :
conf
DOI :
10.1109/POWERENG.2007.4380134
Filename :
4380134
Link To Document :
بازگشت