Title :
Bottlenecks with respect to due-time performance in pull serial production lines
Author :
Li, Jingshan ; Meerkov, Semyon M.
Author_Institution :
Dept. of Electr. Eng. & Comput. Sci., Michigan Univ., Ann Arbor, MI, USA
Abstract :
The problem of satisfying customers demand in pull serial production lines is addressed. The level of demand satisfaction is quantified by the due-time performance (DTP), which is defined as the probability to ship to the customer a required number of parts during a fixed time interval. The definitions of DTP bottlenecks are introduced and a method for their identification is developed
Keywords :
Markov processes; probability; production control; bottlenecks; customers demand; demand satisfaction; due-time performance; pull serial production lines; Desktop publishing; Electric breakdown; Impedance; Manufacturing; Marine vehicles; Production systems; Random variables; Throughput; Time measurement;
Conference_Titel :
Robotics and Automation, 2000. Proceedings. ICRA '00. IEEE International Conference on
Conference_Location :
San Francisco, CA
Print_ISBN :
0-7803-5886-4
DOI :
10.1109/ROBOT.2000.846425