• DocumentCode
    2061169
  • Title

    Integrated model of productivity and quality in serial production lines with repairs: Performance evaluation and bottleneck identification

  • Author

    Feng Ju ; Jingshan Li ; Guoxian Xiao ; Arinez, Jorge

  • Author_Institution
    Manuf. Syst. Res. Lab., Gen. Motors R&D Center, Warren, MI, USA
  • fYear
    2013
  • fDate
    17-20 Aug. 2013
  • Firstpage
    783
  • Lastpage
    788
  • Abstract
    In this paper, an integrated model of productivity and quality in serial production lines with repairs is introduced. Analytical methods based on overlapping decomposition approach have been developed to estimate line production rate of conforming parts. In addition, identification methods based on the data on the factory floor to detect both downtime and quality bottlenecks are presented.
  • Keywords
    industrial plants; maintenance engineering; productivity; quality control; bottleneck identification; downtime detection; factory floor; performance evaluation; productivity; quality; repairs; serial production lines; Accuracy; Inspection; Maintenance engineering; Manufacturing systems; Performance evaluation; Productivity; Quality; bottleneck; integration; productivity; repair; serial line;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering (CASE), 2013 IEEE International Conference on
  • Conference_Location
    Madison, WI
  • ISSN
    2161-8070
  • Type

    conf

  • DOI
    10.1109/CoASE.2013.6653958
  • Filename
    6653958