DocumentCode :
2062929
Title :
Implementation of a relay coordination system for the mars network
Author :
Allard, Daniel A.
Author_Institution :
Jet Propulsion Lab., California Inst. of Technol., Pasadena, CA, USA
fYear :
2010
fDate :
6-13 March 2010
Firstpage :
1
Lastpage :
12
Abstract :
Mars network relay operations involve the coordination of lander and orbiter teams through long-term and short-term planning, tactical changes and post-pass analysis, Much of this coordination is managed through email traffic and point-to-point file data exchanges. It is often difficult to construct a complete and accurate picture of the relay situation at any given moment, as there is no centralized store of correlated relay data. The Mars Relay Operations Service (MaROS) is being implemented to address the problem of relay coordination for current and next-generation relay missions. The service is provided for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These "relay" sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This paper will discuss the relay coordination problem space, overview the architecture and design selected to meet system requirements, and describe the first phase of system implementation.
Keywords :
Mars; satellite communication; space vehicles; Earth-based spacecraft operators; Mars network; Mars relay operations service; communications sessions scheduling; email traffic; end-to-end strategic coordination process; landed spacecraft assets; long-term planning; orbiting spacecraft assets; point-to-point file data exchanges; post-pass analysis; relay coordination system; short-term planning; tactical changes; Costs; Data engineering; Data visualization; Delay; Downlink; Laboratories; Mars; Propulsion; Relays; Space vehicles;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Aerospace Conference, 2010 IEEE
Conference_Location :
Big Sky, MT
ISSN :
1095-323X
Print_ISBN :
978-1-4244-3887-7
Electronic_ISBN :
1095-323X
Type :
conf
DOI :
10.1109/AERO.2010.5446812
Filename :
5446812
Link To Document :
بازگشت