  • Abstract
    Power system protection is a mission critical task that must be accomplished within the specified time limits so as to maintain the stability, reliability, and safety of the grid. As modern substations embrace the integrated communications and LAN-based substation automation systems using IEC61850 standard, the network latency and reliability issues continue to influence the decision making process to move the critical protection tasks to LAN-based substation automation systems (SAS) and eliminate the laborious and costly copper hard-wiring in the substations. Backup protection functions such as circuit breaker failure (CBF) protection seems to be a good candidate to implement in SAS to gain the operational experience with the new paradigm. CBF protection is a deferred protection function and can tolerate variations in network latency with proper design. This paper explores this application and offers two metrics to assess availability followed by presentation of a case study to illustrate the concepts and this particular application.
  • Keywords
    IEC standards; circuit breakers; copper; decision making; local area networks; power system protection; power system reliability; substation automation; substation protection; IEC 61850 standard; LAN based substation automation systems; SAS; backup protection functions; circuit breaker failure protection; copper hard wiring; critical protection tasks; decision making; integrated communications; mission critical task; network latency; power system protection; substation protection; Availability; Circuit breakers; Measurement; Relays; Substations; Synthetic aperture sonar; CBF protection; GOOSE messaging; IEC61850; substation automation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting, 2012 IEEE
  • Conference_Location
    San Diego, CA
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4673-2727-5
  • Electronic_ISBN
    1944-9925
  • Type

    conf

  • DOI
    10.1109/PESGM.2012.6345570
  • Filename
    6345570