DocumentCode
2068520
Title
Study on execution time of ladder diagram in programmable controller
Author
Itoh, Yoshiaki ; Miyazawa, Iko ; Sekiguchi, Takashi
Author_Institution
Kanagawa Ind. Technol. Res. Inst., Japan
Volume
1
fYear
1998
fDate
31 Aug-4 Sep 1998
Firstpage
149
Abstract
In this paper, we propose the simple experimental method to realize the execution time of ladder diagram (LD) in programmable controllers (PCs). Characteristics of the execution time of a LD are examined experimentally by using the fundamental LD with repetition. Moreover, we establish the estimation method of the execution time of LD. Thus, the relationship between the execution time and the number of vertical rungs, logical AND and OR operations is examined by adding some contacts to the proposed fundamental LD. The experimental results are analyzed statistically. As a result, the increase of the execution time for the number of rungs is remarkable as compared with that of AND and OR operations
Keywords
programmable controllers; estimation method; ladder diagram execution time; logical AND operations; logical OR operations; programmable controller; vertical rungs; Computer architecture; Hardware; IEC standards; Industrial control; Manufacturing processes; Personal communication networks; Programmable control; Real time systems; Software design; Timing;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Electronics Society, 1998. IECON '98. Proceedings of the 24th Annual Conference of the IEEE
Conference_Location
Aachen
Print_ISBN
0-7803-4503-7
Type
conf
DOI
10.1109/IECON.1998.723961
Filename
723961
Link To Document