DocumentCode
2069749
Title
Regional and inter-regional transmission planning and cost allocation
Author
Hecker, L. ; Rui Bo ; Osborn, D. ; Lawhorn, J.
Author_Institution
Midwest Indep. Transm. Syst. Operator (MISO), St. Paul, MN, USA
fYear
2012
fDate
22-26 July 2012
Firstpage
1
Lastpage
7
Abstract
This paper provides a brief overview on FERC Order 1000 and MISO value-based planning process. The focus of this paper is to provide the concepts of two distinct cost allocation methodologies, economic benefit based and transmission usage based, which could be used as potential prototypes for FERC Order 1000 compliance.
Keywords
power transmission economics; power transmission planning; FERC Order 1000 compliance; MISO value-based planning process; distinct cost allocation methodologies; economic benefit; interregional transmission planning; regional transmission planning; transmission usage; Copper; Economics; Planning; Reliability engineering; Resource management; Robustness; Compliance; FERC Order 1000; Inter-Regional; Regional; cost allocation; energy policy; power markets; transmission planning;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting, 2012 IEEE
Conference_Location
San Diego, CA
ISSN
1944-9925
Print_ISBN
978-1-4673-2727-5
Electronic_ISBN
1944-9925
Type
conf
DOI
10.1109/PESGM.2012.6345711
Filename
6345711
Link To Document