DocumentCode :
2070085
Title :
Teesside cogeneration project and Dowty digital protection scheme
Author :
Stanley, G. Brian ; Lyon, Tony
Author_Institution :
Teesside Power Ltd., UK
fYear :
1995
fDate :
34788
Firstpage :
42552
Lastpage :
42556
Abstract :
This paper is in two halves: a general overview of the Teesside Project followed by a description of the Dowty protection system between the generating units and the two gas installed substations. The Teesside Power Station is by far the largest independent power station in the UK. It comprises an 1875 MW combined-cycle gas turbine cogeneration plant (CCGT) and has the giant ICI Wilton site as a steam host. The authors describe the main features of the plant, the balance of the plant, process control and staffing. The authors then describe the Dowty pilot wire interface and digital channel protection scheme
Keywords :
cogeneration; combined cycle power stations; electric generators; gas turbine power stations; machine protection; power station control; Dowty digital protection; Dowty pilot wire interface; ICI Wilton site; Teesside Power Station; Teesside cogeneration project; UK; combined-cycle gas turbine cogeneration plant; digital channel protection scheme; gas installed substations; generating units; process control; staffing; steam host;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Combined Cycle/Cogeneration Systems, IEE Colloquium on
Conference_Location :
London
Type :
conf
DOI :
10.1049/ic:19950421
Filename :
473047
Link To Document :
بازگشت