• DocumentCode
    2070319
  • Title

    Implementation and operational benefits of integrated digital generator protection

  • Author

    Price, R.T.

  • fYear
    1995
  • fDate
    34788
  • Firstpage
    42522
  • Lastpage
    42524
  • Abstract
    The application of modern, integrated generator protection can help reduce the design and construction lead times for new generating plant, as well as the time required for routine periodic testing. A digital protection package offers additional functionality, in terms of instrumentation, data acquisition and data recording. The return on investment in a modern protection system can be increased
  • Keywords
    data acquisition; data recording; digital instrumentation; electric generators; machine protection; machine testing; power engineering computing; data acquisition; data recording; instrumentation; integrated digital generator protection; investment return; operational benefits; protection system; routine periodic testing;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Combined Cycle/Cogeneration Systems, IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/ic:19950420
  • Filename
    473048