• DocumentCode
    2071370
  • Title

    Branch-and-bound style resource constrained scheduling using efficient structure-aware pruning

  • Author

    Mingsong Chen ; Saijie Huang ; Geguang Pu ; Mishra, P.

  • Author_Institution
    Shanghai Key Lab. of Trustworthy Comput., East China Normal Univ., Shanghai, China
  • fYear
    2013
  • fDate
    5-7 Aug. 2013
  • Firstpage
    224
  • Lastpage
    229
  • Abstract
    Branch-and-bound approaches are promising in pruning infeasible search space during the resource constrained scheduling (RCS). However, such methods only compare the estimated upper and lower bounds of an incomplete schedule to the length of the best feasible schedule at that iteration. This paper proposes an efficient pruning technique which can identify the fruitless search space based on the detailed structural scheduling information of the obtained best feasible schedule. The proactive nature of our pruning technique enables the pruning of the space which cannot be identified by the state-of-the-art branch-and-bound techniques. The experimental results demonstrate that our approach can drastically (up to two orders-of-magnitude) reduce the overall RCS time under a wide variety of resource constraints.
  • Keywords
    processor scheduling; tree searching; RCS time; branch-and-bound style resource constrained scheduling; branch-and-bound techniques; fruitless search space; orders-of-magnitude; pruning technique; structural scheduling information; structure-aware pruning; Benchmark testing; Dispatching; Estimation; Optimal scheduling; Processor scheduling; Schedules; Scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    VLSI (ISVLSI), 2013 IEEE Computer Society Annual Symposium on
  • Conference_Location
    Natal
  • ISSN
    2159-3469
  • Type

    conf

  • DOI
    10.1109/ISVLSI.2013.6654637
  • Filename
    6654637