DocumentCode :
2075310
Title :
A smooth transition from work breakdown structure to program plan: a minimum cost and risk model for Turkish Space Program
Author :
Cakmak, Murat Arda ; Yuksel, Sadik Murat ; Gokpinar, Eyup Serdar
Author_Institution :
Defense Industries Res. & Dev. Inst., TUBITAK, Ankara, Turkey
fYear :
2005
fDate :
9-11 June 2005
Firstpage :
817
Lastpage :
822
Abstract :
In this paper, for an influent program plan, a process beginning from work breakdown structure (WBS) to get a minimum cost and risk model will be exhibited. As a good example of this process, a sample part of the Turkish Space Program (TSP) will be discussed. After the definitions of the terms that are used in the model will be given, the model definition will be presented with the evaluation methods descriptions. Finally, the technology challenge capacity will be outlined for Turkey. The process will also be suggested for future progress in the model given. This model can only be the beginning of the TSP as a small scale example.
Keywords :
aerospace industry; space research; Turkey; Turkish Space Program; minimum cost and risk model; minimum cost model; minimum risk model; program plan; work breakdown structure; Contracts; Costs; Decision making; Defense industry; Electric breakdown; Finance; Hardware; Project management; Research and development; Systems engineering and theory;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Recent Advances in Space Technologies, 2005. RAST 2005. Proceedings of 2nd International Conference on
Print_ISBN :
0-7803-8977-8
Type :
conf
DOI :
10.1109/RAST.2005.1512692
Filename :
1512692
Link To Document :