• DocumentCode
    2079269
  • Title

    Innovative systems engineering practices that help manage the organisational and technical complexity of a modern railway project

  • Author

    Stubbs, M. ; Knott, A.

  • Author_Institution
    CEng FIET, London
  • fYear
    2008
  • fDate
    25-28 March 2008
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The paper has outlined the approach adopted by transport for London (TfL) for one of its largest rail projects to manage the technical and organisational complexity involved in delivering an operational and maintainable railway for London. The East London Line Project (ELLP) is now well into detailed design and construction stages and the tools and techniques of systems engineering have shown their benefit in defining clear responsibilities and the ability to control the project effectively, particularly in the areas of requirements and change management.
  • Keywords
    management of change; railways; East London Line Project; change management; innovative systems engineering practices; modern railway project; organisational complexity; technical complexity;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Railway Engineering - Challenges for Railway Transportation in Information Age, 2008. ICRE 2008. International Conference on
  • Conference_Location
    Hong Kong
  • ISSN
    0537-9989
  • Type

    conf

  • Filename
    4730826