DocumentCode :
2079269
Title :
Innovative systems engineering practices that help manage the organisational and technical complexity of a modern railway project
Author :
Stubbs, M. ; Knott, A.
Author_Institution :
CEng FIET, London
fYear :
2008
fDate :
25-28 March 2008
Firstpage :
1
Lastpage :
6
Abstract :
The paper has outlined the approach adopted by transport for London (TfL) for one of its largest rail projects to manage the technical and organisational complexity involved in delivering an operational and maintainable railway for London. The East London Line Project (ELLP) is now well into detailed design and construction stages and the tools and techniques of systems engineering have shown their benefit in defining clear responsibilities and the ability to control the project effectively, particularly in the areas of requirements and change management.
Keywords :
management of change; railways; East London Line Project; change management; innovative systems engineering practices; modern railway project; organisational complexity; technical complexity;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Railway Engineering - Challenges for Railway Transportation in Information Age, 2008. ICRE 2008. International Conference on
Conference_Location :
Hong Kong
ISSN :
0537-9989
Type :
conf
Filename :
4730826
Link To Document :
بازگشت