DocumentCode :
2082004
Title :
Data mining for the optimization of production scheduling in flexible Manufacturing System
Author :
Cao, Yan ; Xu, Xu ; Sun, Fengru
Author_Institution :
Coll. of Electron. & Inf. Eng., Lanzhou Jiaotong Univ., Lanzhou, China
Volume :
1
fYear :
2008
fDate :
17-19 Nov. 2008
Firstpage :
252
Lastpage :
255
Abstract :
Provided with plenty of data (experience), data mining techniques are widely used to extract suitable management skills from the data. Nevertheless, in the early stages of a manufacturing system, only rare data can be obtained, and built scheduling knowledge is usually fragile. In most research process of production scheduling based on simulation conditions, the waiting time of every essential step is often omitted. But the time is very important to actual flexible manufacturing system, so we propose a novel approach combing data mining technique, and the multi-agent simulation platform to find the optimization of production scheduling. After experiments, the results of production scheduling problem can be significantly improved using the proposed method.
Keywords :
data mining; flexible manufacturing systems; multi-agent systems; scheduling; data mining; flexible manufacturing system; management skills; multi-agent simulation; production scheduling; Conference management; Data mining; Databases; Dynamic scheduling; Engineering management; Flexible manufacturing systems; Job shop scheduling; Knowledge engineering; Knowledge management; Production systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent System and Knowledge Engineering, 2008. ISKE 2008. 3rd International Conference on
Conference_Location :
Xiamen
Print_ISBN :
978-1-4244-2196-1
Electronic_ISBN :
978-1-4244-2197-8
Type :
conf
DOI :
10.1109/ISKE.2008.4730936
Filename :
4730936
Link To Document :
بازگشت