Research on estimated method of project duration based on design structure matrix
Author :
Shao-hui, Su ; Guo-jin, Chen ; You-ping, Gong
Author_Institution :
School of Mechanical Engineering, Hangzhou Dianzi University, China
fYear :
2010
fDate :
4-6 Dec. 2010
Firstpage :
5310
Lastpage :
5313
Abstract :
In product development project, there were many kinds of connections among activities like sequence, concurrent and Iteration. Between the various activities, there were some links through the material, data or information transfer. Design structure matrix could describe and analyze coupling relation between activities. On the basis of considering the interval and overlap between activities, estimation method of project duration was put forward, which could estimate project duration more efficiently and accurately. A product development example was given to verify the feasibility of principle.
Keywords :
Analytical models; Books; Couplings; Materials; Product development; Project management; Scheduling; Design Structure Matrix; Estimated Duration; Project Management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location :
Hangzhou, China
Print_ISBN :
978-1-4244-7616-9
Type :
conf
DOI :
10.1109/ICISE.2010.5688586
Filename :
5688586
Link To Document :
بازگشت