Research on estimated method of project duration based on design structure matrix
Author
Shao-hui, Su ; Guo-jin, Chen ; You-ping, Gong
Author_Institution
School of Mechanical Engineering, Hangzhou Dianzi University, China
fYear
2010
fDate
4-6 Dec. 2010
Firstpage
5310
Lastpage
5313
Abstract
In product development project, there were many kinds of connections among activities like sequence, concurrent and Iteration. Between the various activities, there were some links through the material, data or information transfer. Design structure matrix could describe and analyze coupling relation between activities. On the basis of considering the interval and overlap between activities, estimation method of project duration was put forward, which could estimate project duration more efficiently and accurately. A product development example was given to verify the feasibility of principle.
Keywords
Analytical models; Books; Couplings; Materials; Product development; Project management; Scheduling; Design Structure Matrix; Estimated Duration; Project Management;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location
Hangzhou, China
Print_ISBN
978-1-4244-7616-9
Type
conf
DOI
10.1109/ICISE.2010.5688586
Filename
5688586
Link To Document