    Research on estimated method of project duration based on design structure matrix

  • Author

    Shao-hui, Su ; Guo-jin, Chen ; You-ping, Gong

  • Author_Institution
    School of Mechanical Engineering, Hangzhou Dianzi University, China
  • fYear
    2010
  • fDate
    4-6 Dec. 2010
  • Firstpage
    5310
  • Lastpage
    5313
  • Abstract
    In product development project, there were many kinds of connections among activities like sequence, concurrent and Iteration. Between the various activities, there were some links through the material, data or information transfer. Design structure matrix could describe and analyze coupling relation between activities. On the basis of considering the interval and overlap between activities, estimation method of project duration was put forward, which could estimate project duration more efficiently and accurately. A product development example was given to verify the feasibility of principle.
  • Keywords
    Analytical models; Books; Couplings; Materials; Product development; Project management; Scheduling; Design Structure Matrix; Estimated Duration; Project Management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Science and Engineering (ICISE), 2010 2nd International Conference on
  • Conference_Location
    Hangzhou, China
  • Print_ISBN
    978-1-4244-7616-9
  • Type

    conf

  • DOI
    10.1109/ICISE.2010.5688586
  • Filename
    5688586