DocumentCode :
2084408
Title :
Risk assessment in research projects
Author :
Schmidt, Roland
Author_Institution :
Corp. Res., ABB Switzerland Ltd., Baden, Switzerland
fYear :
2010
fDate :
25-28 Jan. 2010
Firstpage :
1
Lastpage :
6
Abstract :
The industry for renewable energy like windpower is requesting equipment with low failures and a high reliability over quite a long time period. This is especially important for offshore wind parks as maintenance is challenging. Approaches are necessary to fulfill these requests for less failures and higher reliability without cost explosion. The earlier in the product development process reliability and risk assessment is performed, the easier and cheaper is a design improvement. Therefore, it is important to include risk assessment already in research and predevelopment projects. For a good risk assessment structured methods are necessary. Failure Mode and Effect Analysis (FMEA) and Design Review Based on Failure Mode (DRBFM) are discussed, experiences are shared, and adaptations are shown how FMEA and DRBFM can be a used in a creative and structured way in research projects.
Keywords :
failure analysis; maintenance engineering; product development; project management; risk management; wind power; DRBFM; FMEA; design improvement; design review based on failure mode; failure mode and effect analysis; maintenance; product development; reliability; renewable energy industry; research projects; risk assessment; windpower industry; Automotive engineering; Costs; Electrical products industry; Failure analysis; Maintenance; Product development; Project management; Risk management; Testing; Wind turbines; DRBFM; FMEA; Risk Assessment;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Reliability and Maintainability Symposium (RAMS), 2010 Proceedings - Annual
Conference_Location :
San Jose, CA
ISSN :
0149-144X
Print_ISBN :
978-1-4244-5102-9
Electronic_ISBN :
0149-144X
Type :
conf
DOI :
10.1109/RAMS.2010.5448039
Filename :
5448039
Link To Document :
بازگشت