DocumentCode
2085608
Title
The status of Arch Arc in the High-speed electrified railway
Author
Deng Ming-li ; Ye Qiang ; Wei Xin ; Wu Guang-ning
fYear
2010
fDate
28-31 March 2010
Firstpage
1
Lastpage
3
Abstract
With the speed of electrified railway improving, the getting worse arch arc, has become one of constraining bottleneck in the development of China high-speed railway. This paper has discussed the hazards of arc to the contact wire, pantograph skateboards, communication signals, radio signals and power quality. From the aspects of arc model, arc energy, arc erosion and carrier friction, summarizes the research actuality of to arc issues ,and affords information in research work for further reference.
Keywords
arcs (electric); hazards; power supply quality; railway electrification; China high-speed electrified railway; arch arc; communication signals; contact wire; pantograph skateboards; power quality; radio signals; Circuit breakers; Contacts; Electrodes; Hazards; Mathematical model; Plasma simulation; Rail transportation; Railway electrification; Testing; Wire;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Engineering Conference (APPEEC), 2010 Asia-Pacific
Conference_Location
Chengdu
Print_ISBN
978-1-4244-4812-8
Electronic_ISBN
978-1-4244-4813-5
Type
conf
DOI
10.1109/APPEEC.2010.5448132
Filename
5448132
Link To Document