• DocumentCode
    2085608
  • Title

    The status of Arch Arc in the High-speed electrified railway

  • Author

    Deng Ming-li ; Ye Qiang ; Wei Xin ; Wu Guang-ning

  • fYear
    2010
  • fDate
    28-31 March 2010
  • Firstpage
    1
  • Lastpage
    3
  • Abstract
    With the speed of electrified railway improving, the getting worse arch arc, has become one of constraining bottleneck in the development of China high-speed railway. This paper has discussed the hazards of arc to the contact wire, pantograph skateboards, communication signals, radio signals and power quality. From the aspects of arc model, arc energy, arc erosion and carrier friction, summarizes the research actuality of to arc issues ,and affords information in research work for further reference.
  • Keywords
    arcs (electric); hazards; power supply quality; railway electrification; China high-speed electrified railway; arch arc; communication signals; contact wire; pantograph skateboards; power quality; radio signals; Circuit breakers; Contacts; Electrodes; Hazards; Mathematical model; Plasma simulation; Rail transportation; Railway electrification; Testing; Wire;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Engineering Conference (APPEEC), 2010 Asia-Pacific
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4244-4812-8
  • Electronic_ISBN
    978-1-4244-4813-5
  • Type

    conf

  • DOI
    10.1109/APPEEC.2010.5448132
  • Filename
    5448132