DocumentCode
2088821
Title
Study for Realizing Effective Direct Tool-to-Tool Delivery
Author
Kondo, Hiroshi ; Harada, Mitsuru
Author_Institution
Asyst Shinko Inc., Mie
fYear
2005
fDate
13-15 Sept. 2005
Firstpage
21
Lastpage
24
Abstract
Direct tool-to-tool delivery is one of technical topics for excellent fab performance. Automatic material handling system (AMHS) vendors supply unified OHT systems that can provide direct tool-to-tool delivery routes. But providing such routes is not sufficient to realize direct deliveries. The purpose of our study is to identify remaining issues required to realize direct tool-to-tool delivery. Our conclusions are: (1) AMHS cannot realize direct tool-to-tool delivery by itself without any degradation of fab throughput, and (2) effective algorithms for lot scheduling/dispatching and variability reduction of tool process rate are required to realize it without such degradation
Keywords
dispatching; integrated circuit manufacture; integrated circuit technology; materials handling; scheduling; automatic material handling system vendors; direct tool-to-tool delivery; fab throughput; lot dispatching; lot scheduling; tool process rate; Degradation; Dispatching; Flowcharts; Job shop scheduling; Logic; Materials handling; Scheduling algorithm; Throughput; Vehicles; Virtual manufacturing;
fLanguage
English
Publisher
ieee
Conference_Titel
Semiconductor Manufacturing, 2005. ISSM 2005, IEEE International Symposium on
Conference_Location
San Jose, CA
Print_ISBN
0-7803-9143-8
Type
conf
DOI
10.1109/ISSM.2005.1513286
Filename
1513286
Link To Document