• DocumentCode
    2088821
  • Title

    Study for Realizing Effective Direct Tool-to-Tool Delivery

  • Author

    Kondo, Hiroshi ; Harada, Mitsuru

  • Author_Institution
    Asyst Shinko Inc., Mie
  • fYear
    2005
  • fDate
    13-15 Sept. 2005
  • Firstpage
    21
  • Lastpage
    24
  • Abstract
    Direct tool-to-tool delivery is one of technical topics for excellent fab performance. Automatic material handling system (AMHS) vendors supply unified OHT systems that can provide direct tool-to-tool delivery routes. But providing such routes is not sufficient to realize direct deliveries. The purpose of our study is to identify remaining issues required to realize direct tool-to-tool delivery. Our conclusions are: (1) AMHS cannot realize direct tool-to-tool delivery by itself without any degradation of fab throughput, and (2) effective algorithms for lot scheduling/dispatching and variability reduction of tool process rate are required to realize it without such degradation
  • Keywords
    dispatching; integrated circuit manufacture; integrated circuit technology; materials handling; scheduling; automatic material handling system vendors; direct tool-to-tool delivery; fab throughput; lot dispatching; lot scheduling; tool process rate; Degradation; Dispatching; Flowcharts; Job shop scheduling; Logic; Materials handling; Scheduling algorithm; Throughput; Vehicles; Virtual manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing, 2005. ISSM 2005, IEEE International Symposium on
  • Conference_Location
    San Jose, CA
  • Print_ISBN
    0-7803-9143-8
  • Type

    conf

  • DOI
    10.1109/ISSM.2005.1513286
  • Filename
    1513286