• DocumentCode
    2088939
  • Title

    From requirements to release criteria: specifying, monitoring, and demonstrating product quality

  • Author

    Simmons, Erik

  • fYear
    2003
  • fDate
    8-12 Sept. 2003
  • Firstpage
    286
  • Abstract
    Specifying quality requirements is an excellent first step to predictable, managed product quality, but it is just the beginning. Quality specification, quality planning, data generation, quality monitoring, and quality reporting all work together to ensure that quality levels are known throughout the project. Quality release criteria are a good way to ensure that product quality drives interim milestone releases and the final product release. Requirements and release criteria are mutually influential, and quantified requirements are an essential part of this process.
  • Keywords
    formal specification; quality management; software quality; data generation; managed product quality; quality monitoring; quality planning; quality reporting; quality requirements specification; software quality release criteria; Monitoring;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Requirements Engineering Conference, 2003. Proceedings. 11th IEEE International
  • ISSN
    1090-705X
  • Print_ISBN
    0-7695-1980-6
  • Type

    conf

  • DOI
    10.1109/ICRE.2003.1232763
  • Filename
    1232763