Title :
Testing with partial traced requirements: a necessary step towards higher quality system level verification
Abstract :
Summary form only given. We propose new approach called testing with partial traced requirements as an alternate solution to achieve quality system verification when sub-requirement tracing is unavailable. Partially traced requirements have already been used in a large two years project at Guidant Corporation. The project, called TMS, researched, built, and deployed a comprehensive test management system based on Guidant traceability graph. Partially traced requirements were successfully used: first to identify the issues related to sub-requirement tracing, and second to define a semi automated strategy to increase the quality system verification. In addition to presenting the methodology, we also report on the experiences and lessons learned during development and deployment of TMS.
Keywords :
formal specification; formal verification; program testing; software quality; systems analysis; Guidant traceability graph; TMS project; partial traced requirement; quality system level verification; semi automated strategy; sub-requirement tracing; test management system; Application software; Project management; Software quality; Software testing; System testing; Time to market;
Conference_Titel :
Requirements Engineering Conference, 2003. Proceedings. 11th IEEE International
Print_ISBN :
0-7695-1980-6
DOI :
10.1109/ICRE.2003.1232772