  • Abstract
    The purpose of this article is to define and quantify the bubble phenomenon in a semiconductors fab. A "local bubble" is a relatively acute local and temporal WIP congestion. The local bubble is empirically identified and its impact on the local cycle time distribution is assessed. We then estimate its marginal impact on the overall line cycle time and cost. Finally, a novel visualization of the bubble progression is proposed
  • Keywords
    costing; integrated circuit manufacture; work in progress; WIP bubbles; bubble progression; cost estimation; cycle time distribution; line cycle time; local bubble; semiconductors fab; work-in-progress congestion; Control charts; Costs; Delay effects; Engineering management; Industrial engineering; Performance loss; Poles and towers; Production; Propagation delay; Visualization;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing, 2005. ISSM 2005, IEEE International Symposium on
  • Conference_Location
    San Jose, CA
  • Print_ISBN
    0-7803-9143-8
  • Type

    conf

  • DOI
    10.1109/ISSM.2005.1513368
  • Filename
    1513368