DocumentCode
2095708
Title
Analysis and Improvement of Scheduling Algorithms Based on (m, k)-Firm Constraint
Author
Li Lanying ; Tan Yu
Author_Institution
Sch. of Comput. Sci. & Technol., Harbin Univ. of Sci. & Technol., Harbin, China
Volume
2
fYear
2008
fDate
20-22 Dec. 2008
Firstpage
74
Lastpage
77
Abstract
On the basis of the definition of WHRT (weakly hard real-time), this paper summarizes the constraint qualifications of the existing WHRT and scheduling algorithms, places emphasis on the discussion of DBP algorithm and E-DBP algorithm, proposes two concepts according to the deficiencies of the two algorithms, namely total distance of entering invalidation and total distance of aborting invalidation, presents the distance calculation equation, develops TDBP(total distance based priority) algorithm and extends the priority setting methods of DBP and E-DBP further more which solve the problem of the 01 state distributing information ignored in both algorithms. The simulation results indicate that TDBP has reduced the rate of dynamic invalidation and increased the performance of the system, and it also makes the number of received packets in each terminal close to average value.
Keywords
multimedia communication; quality of service; scheduling; telecommunication network management; (m, k)-firm constraint; (weakly hard real-time; 0-1 state distributing information; QoS; WHRT algorithms; multimedia network; scheduling algorithms; total distance based priority algorithm; Algorithm design and analysis; Computer science; Equations; Information analysis; Multimedia systems; Permission; Qualifications; Real time systems; Scheduling algorithm; Time factors; (m; WHRT; k)-firm constraint; scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Science and Computational Technology, 2008. ISCSCT '08. International Symposium on
Conference_Location
Shanghai
Print_ISBN
978-1-4244-3746-7
Type
conf
DOI
10.1109/ISCSCT.2008.178
Filename
4731575
Link To Document