DocumentCode
2100516
Title
Post-Evaluating of Wind Power Project Based On AHP Model
Author
Liu, Chongming ; Chen, Dan ; Feng, Yan
Author_Institution
Coll. of Econ. & Manage., North China Electr. Power Univ., Beijing, China
fYear
2010
fDate
28-31 March 2010
Firstpage
1
Lastpage
4
Abstract
Post-evaluation of wind power construction project has great significance to improve the project decision-making and management, it is the urgent need to improve on post-evaluation theory and method. This paper builds the post-evaluation management system based on the study of post-project evaluation theory, which is suitable for the characteristics of wind power projects, describes indicators, methods and evaluation criteria of this system in detail, applying analytical hierarchy process (AHP) and success appraisal method to do case research. Practice shows that the system of power project post-assessment management we built is scientific, practical, and having the higher expansion value.
Keywords
decision making; wind power plants; AHP model; analytical hierarchy process; post-evaluation management system; project decision-making; wind power construction project; Decision making; Energy management; Environmental economics; Investments; Power generation economics; Power system management; Project management; Quality management; Resource management; Wind energy;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Engineering Conference (APPEEC), 2010 Asia-Pacific
Conference_Location
Chengdu
Print_ISBN
978-1-4244-4812-8
Electronic_ISBN
978-1-4244-4813-5
Type
conf
DOI
10.1109/APPEEC.2010.5448709
Filename
5448709
Link To Document