DocumentCode :
2103112
Title :
Notice of Retraction
The Study of Contractor´s Time Claim and Cost Claim
Author :
Jingbo Jiang ; Yilin Yin
Author_Institution :
Sch. of Manage., Tianjin Univ., Tianjin, China
fYear :
2009
fDate :
20-22 Sept. 2009
Firstpage :
1
Lastpage :
3
Abstract :
Notice of Retraction

After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

This thesis talks from the influence of time claim, cost claim and the main profits of contractor´s time claim and cost claim. Studying contractor´s major goal of claim-time and cost, their relationships, the fundamental purpose of contractor´s time claim is to get compensation cost, this thesis taking a starting point find their interconversion. Acceleration claim can do their interconversion and analyze acceleration claim´s classification and cost structure, contractor can make a reasonable decision making about time claim and cost claim by the contract and their actual condition to maximize their gains.
Keywords :
construction industry; contracts; costing; decision making; acceleration claim; compensation cost; construction contractor; cost claim; decision making; time claim; Acceleration; Contracts; Costs; Decision making; Delay effects; Design engineering; Engineering management; Interference; Technology management; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management and Service Science, 2009. MASS '09. International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-4638-4
Type :
conf
DOI :
10.1109/ICMSS.2009.5302162
Filename :
5302162
Link To Document :
بازگشت