• DocumentCode
    2103112
  • Title

    Notice of Retraction
    The Study of Contractor´s Time Claim and Cost Claim

  • Author

    Jingbo Jiang ; Yilin Yin

  • Author_Institution
    Sch. of Manage., Tianjin Univ., Tianjin, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    3
  • Abstract
    Notice of Retraction

    After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

    We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

    The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

    This thesis talks from the influence of time claim, cost claim and the main profits of contractor´s time claim and cost claim. Studying contractor´s major goal of claim-time and cost, their relationships, the fundamental purpose of contractor´s time claim is to get compensation cost, this thesis taking a starting point find their interconversion. Acceleration claim can do their interconversion and analyze acceleration claim´s classification and cost structure, contractor can make a reasonable decision making about time claim and cost claim by the contract and their actual condition to maximize their gains.
  • Keywords
    construction industry; contracts; costing; decision making; acceleration claim; compensation cost; construction contractor; cost claim; decision making; time claim; Acceleration; Contracts; Costs; Decision making; Delay effects; Design engineering; Engineering management; Interference; Technology management; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5302162
  • Filename
    5302162