DocumentCode :
2106233
Title :
Visual Dynamic Simulation Based Optimal Scheduling of RCC Dam Construction Management
Author :
Zhao, Chunju ; Zhou, Yihong ; An, Hui
Author_Institution :
Coll. of Civil & Hydroelectric Eng., China Three Gorges Univ. (CTGU), Yichang, China
fYear :
2009
fDate :
20-22 Sept. 2009
Firstpage :
1
Lastpage :
4
Abstract :
Roller compacted concrete (RCC) is quite sensitive and construction scheduling for RCC is less forgiving than for conventional concrete. Therefore, systematically managing and scheduling are critical to ensure all related activities be meticulously planned, as well as equipment, workers and materials be well organized and allocated well before construction starts. In view of this, a solution called visual dynamic simulation (VDS) based scheduling approach is built up. It could propose the optimal construction scheduling, simulate and demonstrate the whole construction process in 3-d computer animation, and give the results analyses via tables and graphs. With a case study of longkaikou RCC gravity dam, its effect has successfully proved.
Keywords :
civil engineering computing; computer animation; concrete; construction; dams; digital simulation; scheduling; 3-d computer animation; construction process; construction scheduling; dam construction management; optimal scheduling; roller compacted concrete dam; visual dynamic simulation; Analytical models; Animation; Building materials; Computational modeling; Computer simulation; Concrete; Dynamic scheduling; Gravity; Optimal scheduling; Processor scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management and Service Science, 2009. MASS '09. International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-4638-4
Electronic_ISBN :
978-1-4244-4639-1
Type :
conf
DOI :
10.1109/ICMSS.2009.5302272
Filename :
5302272