DocumentCode
2107545
Title
Redundancy in coupling power line carrier channels to the power line
fYear
2012
fDate
2-5 April 2012
Firstpage
481
Lastpage
490
Abstract
This working group was formed in order to provide a report to the Relaying Communications Subcommittee on the redundancy of various coupling schemes in a power line carrier (PLC) based pilot protection system. Of particular interest, is when the protection is made up of two pilot schemes both of which use PLC for the protection channel. However, the information presented here is also applicable to redundancy within a single pilot protection environment.
Keywords
carrier transmission on power lines; PLC-based pilot protection system; Relaying Communication Subcommittee; power line carrier channel coupling; protection channel;
fLanguage
English
Publisher
ieee
Conference_Titel
Protective Relay Engineers, 2012 65th Annual Conference for
Conference_Location
College Station, TX
Print_ISBN
978-1-4673-1840-2
Type
conf
DOI
10.1109/CPRE.2012.6201256
Filename
6201256
Link To Document