• DocumentCode
    2108281
  • Title

    Validity Verifying Method of Software Project Management

  • Author

    Zhang, Jun-Guang

  • Author_Institution
    Sch. of Econ. & Manage., Univ. of Sci. & Technol. Beijing, Beijing, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    To ensure the validity of software project management method and improve the success rate of software projects, a quantitative and systemic validation method of software project management method validity was studied combined with some actual project cases. By the data revision of the schedule result, the usability of the data could be ensured. By the short-term and small-amount data verification, the organization could obtain the implementation result in time. By the long-term and large-amount data verification, the organization could track the implementation result of software project management method chronically. The statistics of the actual data indicate that these verification methods could reflect the validity of the project management methods adopted by the organization, and could obtain continuous improvement.
  • Keywords
    program verification; project management; software management; data verification; quantitative validation method; software project management; systemic validation method; validity verifying method; Continuous improvement; Costs; Decision making; Estimation error; History; Process control; Project management; Scheduling; Statistics; Usability;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5302352
  • Filename
    5302352